What does a FedRAMP 3PAO assessment cost?
The honest answer first: nobody can give you an exact price, because no 3PAO publishes one. What follows is the best available picture — ranges compiled from multiple industry sources, broken out by level and by phase, with the disagreements shown rather than smoothed over.
Ranges compiled November 2026 from industry sources listed at the bottom of this page. Last updated: 2026-11-17.
Read this before the numbers. No 3PAO publishes a rate card. Every figure on this page is a compiled industry range from third-party sources — advisory firms, GRC vendors, and FedRAMP guides — not a quote from any assessor. The sources disagree at the edges; the consensus core is consistent, and where one source diverges sharply we say so. Treat these ranges as budgeting guidance for planning, then get quotes from assessors. FedRAMP 20x is also changing the cost picture, and its claimed savings are so far supported by a single vendor source (see below).
At a glance
| Item | Low (Class B) | Moderate (Class C) | High (Class D) |
|---|---|---|---|
| 3PAO assessment fee | $75K–$150K | $150K–$400K | $400K–$800K |
| Total initial authorization | $250K–$500K | $500K–$1.5M | $1.5M–$3M+ |
| Total timeline | ~12–18 months | 12–24 months | 18–36 months |
| Annual continuous monitoring | $100K–$600K/year by level (commonly $200K–$500K for Moderate) | ||
Readiness assessment (RAR / FedRAMP Ready)
| Item | Cost | Duration |
|---|---|---|
| Readiness Assessment Report (RAR) by a 3PAO | $25K–$75K | 1–2 months |
The RAR is optional and available for Moderate and High only. A passing RAR earns the FedRAMP Ready designation — now shown as "Legacy FedRAMP Ready" in the Marketplace — valid for one calendar year. Its main value is signaling to prospective agency sponsors that the service is ready for a full assessment. No agency partner is required for a RAR.
The full 3PAO assessment fee
| Level | 3PAO assessment fee | Assessment phase duration |
|---|---|---|
| Low (Class B) | $75K–$150K | 2–4 months including remediation and retesting; the testing window is typically 6–12 weeks, and SAP to SAR often runs 8–16 weeks. |
| Moderate (Class C) | $150K–$400K (most commonly cited: $150K–$300K) | |
| High (Class D) | $400K–$800K |
This is the fee paid to the 3PAO for the assessment itself — developing the Security Assessment Plan, testing controls, interviews, vulnerability scanning, penetration testing, and producing the Security Assessment Report and POA&M. Some sources cite a wider band ($100K–$500K) for the assessment phase; the table above reflects the consensus core across sources.
Total cost of an initial authorization
| Level | Total initial authorization (all-in) | Total timeline |
|---|---|---|
| Low (Class B) | $250K–$500K | ~12–18 months |
| Moderate (Class C) | $500K–$1.5M | 12–24 months |
| High (Class D) | $1.5M–$3M+ | 18–36 months |
"All-in" means the 3PAO fee plus everything else: the federal landing zone and infrastructure, advisory and consulting support, remediation engineering, GRC tooling, and internal staff time. That is why the totals are several times the assessment fee alone.
Where sources diverge. One source (TechVendorIndex) puts first-time Moderate costs at $1.5M–$5M and High at $3M–$8M when the landing zone is included — well above the consensus ranges above. Another source puts the total to first ATO at $750K–$2.5M. The gap mostly reflects what is counted: a CSP building a dedicated federal environment from scratch spends far more than one extending an existing compliant boundary. Budget to the high end of the consensus range if you are building the landing zone from nothing.
Annual continuous monitoring
| Item | Cost |
|---|---|
| Annual continuous monitoring (including the annual 3PAO reassessment, monthly reporting, and annual penetration testing) | $100K–$600K/year by level; commonly $200K–$500K/year for Moderate |
Authorization is not a one-time purchase. Monthly vulnerability scans, POA&M updates, and inventory reporting, plus the annual reassessment and penetration test, continue indefinitely. Budget the annual figure as a permanent operating cost, not a project cost.
Advisory and consulting support
| Item | Cost |
|---|---|
| Advisory / consulting, full lifecycle (gap assessment, boundary and landing-zone design, SSP authorship, evidence preparation, remediation, sponsorship support) | $100K–$500K |
Most first-time CSPs hire a separate advisor — independence rules bar the assessing 3PAO from doing this work for the same system. One source cites $250K–$750K for advisory on a Moderate engagement; the $100K–$500K range is the more commonly cited full-lifecycle band. See the advisors page for the firms in this space.
What drives the price up or down
- Level. The control count roughly triples from Low (~125 controls) to Moderate (~325) to High (~421) — more controls, more testing, more evidence. Control counts are approximate and vary by counting method.
- Boundary size and complexity. A narrow, well-defined federal environment costs less to assess than a sprawling system with many integrations, external services, and data flows.
- Readiness. A CSP that arrives with controls already implemented, evidence organized, and an SSP in good shape spends less on remediation and retesting — the phase where budgets most often blow out.
- Landing zone. Building a dedicated federal environment (typically on FedRAMP-authorized IaaS such as AWS GovCloud or Azure Government) is often the single largest cost line outside the assessment itself.
- Findings. High and Critical findings must be remediated and retested before authorization; each retest cycle adds time and cost.
- Penetration testing. Required for Moderate and High (not Low or LI-SaaS), at least every 12 months, with the initial test no more than 6 months before SAR submission.
FedRAMP 20x: claimed savings, thin evidence
FedRAMP 20x is designed to cut cost and time through automation — machine-validated Key Security Indicators instead of narrative documentation, and no sponsor required at the low end. One vendor guide (platform28) claims a 20x authorization costs $145K–$360K total and takes weeks to about 6 months, versus $500K–$2M+ on the traditional path.
Single-source claim. The $145K–$360K figure comes from one vendor source and has no independent confirmation. Treat it as marketing-grade until more evidence appears. This site will update the 20x cost picture as verified figures emerge.
How to budget in practice
- Start with the total, not the assessment fee. The 3PAO fee is roughly a quarter to a third of the all-in cost for a first authorization.
- Budget the annual figure from day one. Continuous monitoring is a permanent operating cost.
- Get multiple quotes. Assessors price on scope — boundary, control count, readiness — so a quote for your system is the only number that matters. Use the ranges above to judge whether a quote is in the expected band.
- Ask what is included. Retesting, penetration testing, and travel are not always in the headline fee.
- Price the advisor separately. Advisory support is a separate engagement with a separate firm, by rule.
Sources for the ranges
- AuditXYZ, FedRAMP authorization process and framework pages — auditxyz.com
- Drata, FedRAMP overview — drata.com
- Diogenes Club, FedRAMP strategic guide for SaaS leaders — diogenesclub.ca
- TechVendorIndex, FedRAMP advisory — techvendorindex.com
- Qualysec, FedRAMP authorization — qualysec.com
- Luka GRC, FedRAMP glossary — lukagrc.com
- Platform28, FedRAMP 20x guide (single source for the 20x cost claim) — platform28.com
Frequently asked questions
Why doesn't anyone publish 3PAO prices?
Assessors price engagements on scope — the size of the authorization boundary, the number of controls, the CSP's readiness, and the amount of retesting needed — so a flat rate card would mislead more than it helps. The result is that all public cost figures are third-party ranges compiled from advisory firms, vendors, and guides.
Is the 3PAO fee the biggest cost?
No. For a first authorization, the assessment fee is typically a quarter to a third of the all-in cost. The federal landing zone, advisory support, remediation engineering, and internal staff time usually cost more in total.
How much does it cost to stay authorized?
Roughly $100K–$600K per year depending on level, commonly $200K–$500K for Moderate, covering monthly continuous monitoring deliverables, the annual 3PAO reassessment, and annual penetration testing.